SC²
New three-span road bridge (maximum span 64 m) with steel-concrete composite deck, replacing the existing structure damaged by recent floods. BIM/IFC4 modelling and digital twin for the operational phase. RC piers on Ø 1500 bored piles.
TIMELINE
Project phases
2023
2024
2025
2026
2027
APPOINTMENT
JUL 2023
DESIGN
SEP 2023 → JUN 2024
AWARD
SEP 2024
EXECUTION
NOV 2024 → DEC 2026
DELIVERY
JAN 2027
ACCEPTANCE
MAR 2027
- APPOINTMENTJUL 2023
- DESIGNSEP 2023 → JUN 2024
- AWARDSEP 2024
- EXECUTIONNOV 2024 → DEC 2026
- DELIVERYJAN 2027
- ACCEPTANCEMAR 2027